I started working in the bathroom today. I took out the showder doors and the rails.
Just my luck, when I removed the side rails an entire section of tile came down. Now I have to replace them. It will require about 15 to 18 tiles to replace but no matter.
I made arrangements with the office to take two weeks off from work so I can take a vacation and see my family. I bought the tickets so I know I'm set but I don't look forward to coming back.
The work load will be very heavy.
Saturday, January 07, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment